Tampilkan postingan dengan label four. Tampilkan semua postingan
Tampilkan postingan dengan label four. Tampilkan semua postingan

Rabu, 20 April 2016

Take four

0

The second coat of epoxy on the second side of the strakes was applied today. Im really getting good at this- after this second coat, very little sanding will be needed before the final finishing of these particular parts. But that is a ways off. There are a number of internal parts that need the same epoxy treatment before the boat is assembled. There are bulkheads, seats, forward and aft transom, and the daggerboard trunk all to be coated. This is actually very nice to be able to pre-treat these parts before assembly. The epoxy can be applied while they are flat, reducing runs and sags of the unthickened epoxy. It is also much faster and easier to get most of the sanding out of the way on simple, flat parts. However, before the internal parts are done, it looks like I need to build up the forward and aft transoms. These parts have "doublers" or re-reinforcement that need to be bonded together before the parts are coated. Temps are holding in the mid 60s, so epoxy curing still can be done reasonably quickly. Total hours 9.50.

Read more

Sabtu, 09 April 2016

Fab four

0

Another day, another coat of varnish. This morning was coat four. By now I have finally learned some basic lessons. Like not coating the rub rails before I have to lean in and do the bottom panels; less varnish gets on my shirt that way! This weekend should see the last coat on the interior, for now. Then next week, a final coat of white paint on the outer hull, some additional varnish coats on spars and fins, and installation of the hardware and rigging. Launch is officially projected to be August 4, which is also Coast Guard Day! Total Hours 95.50.

Read more

 
Powered by Blogger