
Because the exterior #1 panels had previously been coated with their first coat, a bit of sanding was required to smooth out what may have been outgassing. Also, the bottom panel with its layer of fiberglass benefited from some sanding to knock off the tops of epoxy on the weave. This sanding reduced the amount of epoxy that would required to fill the weave. Total hours 63.75.
0 komentar:
Posting Komentar